Impacts of AI · Site 02 of 08 · Energy · The Current Bill

945Terawatt-hours

The IEA projection cited across this literature has global data-centre electricity demand reaching nearly 945 TWh by 2030, more than double the 415 TWh used in 2024, with AI workloads the principal driver of that growth.

IEA, cited in Chen et al., 2025

Corroborated
Scroll · footage plays as you go

The grid is already full

Data centres drew 415 TWh in 2024, about 1.5% of world electricity, and demand is growing roughly 12–15% a year: several times faster than electricity demand overall.

IEA, cited in Chen et al., 2025

Then it doubles

Forecasts converge on +128% by 2030, from 415 to 945 TWh. Of the 210 GW of generation planned to replace retiring plants and meet new load, DOE finds only 22 GW will be firm, dispatchable capacity.

IEA, cited in Chen et al., 2025; US DOE, Resource Adequacy fact sheet, 2025

The power arrives late

The median interconnection wait is now 5 years, up from under two a decade ago, with over 2,300 GW of generation and storage stalled in US queues.

Mehboob et al., 2026

01 / The case for the build-out

What the build-out buys

Efficiency, clean-power contracts, privately paid transmission and flexible load: the gains the research can put a number on.

Q1 · Efficiency
13.7×
Training-energy cut, TPUv4 vs. 2017 GPU

Google's ML-optimised TPUv4 cut training energy 13.7-fold against the unoptimised 2017 GPU it replaced. Hardware is one of four factors the authors say combine to cut ML carbon footprints up to 747-fold.

Patterson et al. (Google / UC Berkeley), 2022

Single-source
Q2 · Procurement
34GW
Clean power under contract, Microsoft & Amazon

Microsoft (by 2024) and Amazon (by January 2025) each report more than 34 gigawatts of power-purchase agreements for clean generation, larger than the contracted renewable portfolios of most national utilities.

Huang, Deb & Zareipour, 2026, Table I (company sustainability reports)

Company-reported
Q3 · Grid
$4.2bn
Privately funded transmission (Ohio)

SB Energy and AEP Ohio partnered to build $4.2 billion of new transmission for a Portsmouth AI campus, with SB Energy, not ratepayers, committed to paying for it.

US DOE, Portsmouth fact sheet, 2026

Corroborated
Q4 · Cooling
45%
Cooling electricity saved by liquid cooling

Switching from air to direct-to-chip or immersion liquid cooling can cut cooling-related electricity by roughly 40 to 50%, with water use falling 20 to 90% depending on climate and design.

Patel, Mahalingam & Patel, 2026

Single-source
Q5 · Flexibility
25%
Peak power cut in a live grid trial

In the first live demonstration of its kind, Emerald AI cut an Oracle Cloud AI cluster's power draw 25% for three hours during grid peaks in Phoenix, using workload orchestration alone: no batteries, no hardware changes.

Colangelo et al. (Emerald AI / EPRI DCFlex), 2025

Company-reported
01 / 05
Rooftop solar going up
Q2 · New build
500MW
New nuclear SMR capacity anchored by AI offtake

Google's agreement with Kairos Power will deploy small modular reactors supplying up to 500 MW of new clean power to its AI data centres: new generation, not relabelled existing supply.

Huang, Deb & Zareipour, 2026

Single-source
Q6 · Siting, carbon
−49%
Carbon cut by siting in a favourable region

Location and grid mix shape outcomes as strongly as hardware efficiency: placing AI data centres in favourable regions rather than unfavourable ones can cut their carbon emissions by up to 49%.

Patel, Mahalingam & Patel, 2026

Single-source
Q7 · Siting, water
−52%
Water footprint cut by siting

The same choice cuts the water footprint by about 52%. Advanced cooling plus low-carbon, water-secure siting can nearly halve the combined footprint.

Patel, Mahalingam & Patel, 2026

Single-source
No verified statistic

No verified figure exists for the net emissions displaced by workloads that moved from on-premise hardware into these facilities. Vendor claims range from substantial to negligible and share no common methodology; the figure was excluded rather than approximated.

No verified statistic

No verified figure exists for how much contracted clean capacity has actually energised. Contract announcements are public; commissioning dates largely are not.

02 / Emerging & unsettled

Directional, not settled

Modelled, newly measured or still moving: findings that point a direction without closing the question.

Q1 · Overhead
0.09kWh
Overhead per kWh of compute, Google fleet
Overhead energy per kWh of IT load
  1. Industry average, PUE ~1.60.6
  2. Google fleet, PUE 1.090.09
  3. Meta fleet, PUE 1.080.08

Power usage effectiveness of 1.09 (Google) and 1.08 (Meta) means 8–9% extra energy for cooling and power delivery; at the ~1.6 industry average the overhead is 60%. Fleet averages can hide inefficient sites.

Huang, Deb & Zareipour, 2026, Table I; EPRI, Powering Intelligence, 2024

Company-reported
Q5 · Grid services
770MW
Frequency-regulation reserve, CAISO-scale grid model
5.5% of modelled capacity

A CAISO-scale grid model holds 770 MW of frequency-regulation reserve at all times, 5.5% of modelled capacity; the authors propose flexible GPU data centres as a new source for it.

Jahanshahi et al., 2026, ACM

Peer-reviewed
Q8 · Scenarios
US electricity to data centres by 2030, four scenarios
4.6%Low growth, 3.7%/yr
5.0%Moderate, 5%/yr
6.8%High, 10%/yr
9.1%Higher, 15%/yr

EPRI's four growth scenarios take data centres from about 4% of US electricity in 2023 to between 4.6% and 9.1% by 2030.

EPRI, Powering Intelligence, 2024

Single-source
Q5 · Headroom
21%
Power headroom in inference vs. ~3% in training

Measured against rated power, inference servers leave about 21% headroom; training leaves about 3%, because synchronous power peaks run close to the limit. Inference is the candidate for packing more servers onto the same supply.

Measurement study cited in Vercellino et al., 2026

Single-source
Q8 · Share
4.4%of US power
Share of US electricity used by data centres, 2023

US data centres used 176 TWh in 2023, 4.4% of the country's electricity, up from 1.9% six years earlier.

Chen et al., 2025; Golden et al., 2026

Corroborated
No verified statistic

No verified figure exists for inference energy per query at production scale. Every published number is either a vendor estimate or an extrapolation from a single benchmark run; none were reproducible.

No verified statistic

No verified figure exists for the fraction of accelerator idle time that could be eliminated by scheduling alone. The telemetry that would answer it is not published by any operator.

03 / The case against

What the bill looks like

Emissions, water, capacity prices, permits and land: the costs, measured at the same weight as the gains.

Q6 · Emissions
24–44Mt
Added US CO₂e a year from AI servers by 2030

US AI servers are projected to add 24 to 44 million metric tons of CO₂-equivalent emissions a year by 2030, depending on the carbon intensity of the grid supplying them.

Patel, Mahalingam & Patel, 2026

Single-source
Q7 · Water
200–300bn gal
Added US water use a year by 2030

US AI servers are projected to add 200 to 300 billion gallons of water consumption a year by 2030, driven mainly by evaporative cooling.

Patel, Mahalingam & Patel, 2026

Single-source
Q8 · Capacity price
$270
PJM capacity price per MW-day, up from $30

PJM's capacity price, the charge utilities pay to guarantee supply and pass through to customer bills, jumped from $30 to $270 per megawatt-day between 2023 and 2024 amid data-centre load growth.

Luby et al. 2025, cited in Golden et al., 2026

Corroborated
Q9 · Turbine emissions
16×
NOₓ over permit at an AI gas-turbine plant

Satellite monitoring found the gas turbines powering xAI's Colossus 2 data centre emitting NOₓ at roughly 16 times its permitted rate: 730 kg an hour measured against a permitted 47.

Gauld et al. (MIT / Carbon Mapper), 2026

Single-source
Q4 · Land
850ha
Rural land rezoned for one AI campus

The proposed Digital Gateway campus in Prince William County, Virginia would rezone roughly 2,100 acres (850 hectares) of rural land, one of several AI-driven greenfield conversions alongside sites in Indiana and Nebraska.

Bolaños-Zuñiga & Lamadrid, 2026

Single-source
Q10 · Manufacturing
12M
Data-centre servers built worldwide, 2021

Global data-centre server manufacturing reached an estimated 12 million units in 2021; the same authors argue that the lifecycle cost of building this hardware, not operational energy, is the bigger long-term climate risk.

Patterson et al. (Google / UC Berkeley), 2022

Single-source
01 / 06
Industrial stacks
Q9 · Retirement
104GW
Announced US plant closures by 2030

DOE counts 104 GW of announced US plant closures by 2030, to be met by 210 GW of new generation of which only 22 GW is firm, dispatchable capacity; it has issued emergency orders keeping at least one coal plant running past its retirement date.

US generation to 2030, GW
  1. Announced closures104
  2. New generation planned210
  3. Of which firm22

US DOE, Resource Adequacy fact sheet, 2025

Corroborated
Q6 · Marginal intensity
800g
CO₂ per kWh on coal-heavy marginal dispatch

When new AI load is met by marginal coal generation, the authors model roughly 800 g CO₂/kWh, against about 100 g/kWh in a high-renewable system.

Huang, Deb & Zareipour, 2026

Single-source
Q8 · Queue
5yrs
Median wait from interconnection request to operation

More than 2,300 GW of generation and storage is stalled in US interconnection queues; the median project now waits about five years, up from under two a decade ago.

Mehboob et al., 2026

Corroborated
Q6 · Siting, carbon
+90%
Carbon added by siting in an unfavourable region

The mirror of the siting gain: an unfavourable region can raise an AI data centre's carbon emissions by up to 90%.

Patel, Mahalingam & Patel, 2026

Single-source
Q7 · Siting, water
+350%
Water footprint added by siting

Water footprints can rise by more than 350% in an unfavourable region, the widest swing of any factor the study measured.

Patel, Mahalingam & Patel, 2026

Single-source
04 / What nobody can measure

The numbers nobody files

Wide ranges, concentrated risk and thin disclosure: the places where the record is late, partial or inconsistent.

Q8 · US demand by 2028
325–580TWh
Projected US data-centre electricity, 2028

From 176 TWh in 2023, US data-centre use is projected to reach anywhere between 325 and 580 TWh by 2028. The width of the range is the finding: it depends on growth scenarios nobody can yet pin down.

Chen et al., 2025

Single-source
Q7 · Water stress
2 of 15
Top data-centre states flagged for water scarcity

Fifteen states hosted 80% of US data-centre load in 2023. EPRI flags two of them, Arizona and Nevada, for water scarcity as a top challenge, yet siting keeps following cheap land and power there.

VirginiaTexasCaliforniaIllinoisOregonArizonaIowaGeorgiaWashingtonPennsylvaniaNew YorkNew JerseyNebraskaNorth DakotaNevada
Flagged for water scarcityNot flaggedRanked by 2023 data-centre load

EPRI, Powering Intelligence, 2024

Corroborated
Q10 · Build lag
3×
Longer to add generation than to build the data centre

Data centres can be built in 18 months, but bringing new generation online to power them takes more than three times as long: a structural lag between the AI build-out and the grid.

Time to build, months
  1. Data centre18 mo
  2. New generation54+ mo

US DOE, Resource Adequacy fact sheet, 2025

Corroborated
Q3 · Blind spot
82sec
A 1.5 GW Virginia load drop (NERC)

In 2024 a single Virginia data centre dropped 1.5 GW of load from the grid within 82 seconds of a transmission fault. Hyperscalers rarely disclose facility operating data, so regulators often learn of such swings after the fact.

NERC, cited in Vercellino et al., 2026

Corroborated
Q6 · Methodology
258
Data-centre energy estimates reviewed

A review of 258 published estimates of data-centre energy use found methods so inconsistent that results span a wide range: there is no agreed methodology behind even this page's headline numbers.

Mytton review, cited in Vercellino et al., 2026

Single-source
05 / CodaNo statistics in this section

Substation. Coolant. Queue.

Substation
Coolant
Queue
06 / Closing

Who pays the difference?

Both sides above are real. The gains are measured in performance per watt; the costs in ratepayer bills, withdrawn water and permitted gas. Nothing here decides which matters more: that judgement sits with whoever reads the tariff filing. Every figure carries its source and its confidence; where the record was silent, this page says so rather than estimating.

Sources · 14 documentsFrom the LearnHaus energy corpus
  1. 01Electricity Demand and Grid Impacts of AI Data Centers: Challenges and ProspectsChen et al. · arXiv / Cornell University · 2025 · cited for Q0, Q8, Opening
  2. 02The Carbon Footprint of Machine Learning Training Will Plateau, Then DeclinePatterson et al. (Google / UC Berkeley) · arXiv / Cornell University · 2022 · cited for Q1, Q10
  3. 03AI Data Centers and Power System Sustainability: Understanding the Sustainability Implications of AI-Driven Data Centers on Power SystemsHuang, Deb & Zareipour · arXiv / Cornell University · 2026 · cited for Q2, Q1, Q6
  4. 04Fact Sheet: Public-Private Infrastructure Deployments for AI Data Centers at PortsmouthUS DOE, Portsmouth fact sheet · US Department of Energy · 2026 · cited for Q3
  5. 05The Environmental Impact of AI Servers and Sustainable SolutionsPatel, Mahalingam & Patel · arXiv / Cornell University · 2026 · cited for Q4, Q6, Q7
  6. 06Turning AI Data Centers into Grid-Interactive Assets: Results from a Field Demonstration in Phoenix, ArizonaColangelo et al. (Emerald AI / EPRI DCFlex) · arXiv / Cornell University · 2025 · cited for Q5
  7. 07Powering Intelligence: Analyzing Artificial Intelligence and Data Center Energy ConsumptionEPRI, Powering Intelligence · Electric Power Research Institute (EPRI) · 2024 · cited for Q1, Q8, Q7
  8. 08Coordinating GPU Data Centers and Power Grid Regulation Service for Exogenous Carbon BenefitsJahanshahi et al. · ACM · 2026 · cited for Q5
  9. 09Measurement of Generative AI Workload Power Profiles for Whole-Facility Data Center Infrastructure PlanningVercellino et al. · arXiv / Cornell University · 2026 · cited for Q5, Q3, Q6
  10. 10Certificates without Electrons? Theory and Evidence on Impacts from AI-Driven Power DemandGolden et al. · arXiv / Cornell University · 2026 · cited for Q8
  11. 11Quantifying AI data center nitrogen oxide (NO_x) emissions from spaceGauld et al. (MIT / Carbon Mapper) · arXiv / Cornell University · 2026 · cited for Q9
  12. 12Environmental and Economic Implications of Artificial Intelligence Data Centers in the United StatesBolaños-Zuñiga & Lamadrid · arXiv / Cornell University · 2026 · cited for Q4
  13. 13Fact Sheet: Assessment of Resource Adequacy and Grid Reliability Amid Rising Data Center LoadsUS DOE, Resource Adequacy fact sheet · US Department of Energy · 2025 · cited for Q9, Q10, Opening
  14. 14PowerScale: Energy-Efficient Geo-Distributed Model Training with Federated Datacenter PowerMehboob et al. · arXiv / Cornell University · 2026 · cited for Q8, Opening

Four figures are cited second-hand, as their source states: the IEA projection via Chen et al., Luby et al. via Golden et al., and NERC and the Mytton review via Vercellino et al.